Home / Missouri / Clinton

Soil and Septic Site Evaluators in Clinton, MO

21 licensed evaluators serving Clinton, Missouri.

21 Onsite Soil Evaluator

Andreas Fuchs

Onsite Soil Evaluator

Fox Soil Evaluations

(310) 746-7065

Brian McGhee

Onsite Soil Evaluator

McGhee Septic LLC

(660) 525-2924

Carl McDougal

Onsite Soil Evaluator

Dogstone Home Inspection

(417) 350-6379

Catherine Sims

Onsite Soil Evaluator

Sims Sub-Services LLC

(816) 358-6776

Chris Nothstine

Onsite Soil Evaluator

Tall Guy Waste Water Solutions & Soils, LLC

(660) 224-9043

Chris Stiens

Onsite Soil Evaluator

Advanced Aquatics, Stiens Soil Evaluations, LLC

(660) 562-0726

Clay Dyer

Onsite Soil Evaluator

Clay Dyer

(816) 956-1082

Daniel Owens

Onsite Soil Evaluator

Environmental Resolutions

(816) 835-2298

Daniel Pimentel

Onsite Soil Evaluator

A-1 sewer and septic service

(913) 631-5201

Dave Calton

Onsite Soil Evaluator

Digger Dave LLC

(816) 873-2208

Derek Drager

Onsite Soil Evaluator

Zoom Drain

(816) 935-9899

Garry Paul

Onsite Soil Evaluator

Cooters Plumbing & Septic

(816) 419-5974

Gary Usry

Onsite Soil Evaluator

Assured Inspections

(816) 560-6010

John Eales

Onsite Soil Evaluator

Eales Excavating & Septic LLC

(816) 935-7507

John Franke Jr

Onsite Soil Evaluator

ARK Plumbing LLC

(816) 320-3209

Kyle Herren II

Onsite Soil Evaluator

Dump N Pump Septic LLC

(816) 368-2903

L. Atkison

Onsite Soil Evaluator

LJ Atkison Underground Homes, Inc

(816) 645-2736

Nicholas Dykes

Onsite Soil Evaluator

Dykes Construction LLC

(816) 580-4100

Randy Naylor Jr

Onsite Soil Evaluator

Nailed It Services LLC

(417) 229-2550

Scott Dykes

Onsite Soil Evaluator

Dykes Construction LLC

(816) 580-4100

Wesley Christopher

Onsite Soil Evaluator

BM Septic

(816) 622-3373

About soil and septic evaluations in Missouri

Missouri's construction rule (19 CSR 20-3.060) names two site evaluation methods -- a percolation test and a soil morphology evaluation -- and gives the administrative authority with permitting jurisdiction the power to decide which one your site needs. DHSS runs two matching registrations: a Registered Percolation Tester (DHSS-approved training course plus written and practical exams, or existing OSE/PE/geologist qualification) and a Registered On-Site Soil Evaluator, most commonly qualified as a soil scientist (15+ semester credit hours of soils coursework, 3+ specifically in soil morphology, then a written and field exam scored 70% or higher). Both registrations run on a 36-month renewal cycle with continuing education. Conducting either evaluation for OWTS design or installation without the required registration, or misrepresenting yourself as registered, is a class A misdemeanor under RSMo 701.053.

One verified Missouri operator (Show Me Soils, serving the area west of St. Louis including Franklin County) advertises $350 to $550 for the evaluation depending on location -- one operator's current price, not a market average; get quotes from two or three registered evaluators serving your county. The permit fee is separate and varies by jurisdiction: three counties checked directly charge $90 (Moniteau), $150 plus a separate $60 building permit (Monroe), and $510 (Boone) for new construction. There is no statewide flat fee.

Missouri Department of Health and Senior Services (DHSS), Onsite Wastewater Program · Verify a license

Frequently asked questions

How many licensed soil and septic site evaluators serve Clinton, MO?

21 state-licensed evaluators are listed for Clinton in our roster, sourced from the Missouri licensing board: 21 Onsite Soil Evaluator.

How much does a perc test or soil evaluation cost in Clinton?

One verified Missouri operator (Show Me Soils, serving the area west of St. Louis including Franklin County) advertises $350 to $550 for the evaluation depending on location -- one operator's current price, not a market average; get quotes from two or three registered evaluators serving your county. The permit fee is separate and varies by jurisdiction: three counties checked directly charge $90 (Moniteau), $150 plus a separate $60 building permit (Monroe), and $510 (Boone) for new construction. There is no statewide flat fee. Larger parcels, difficult access, and rush requests price above the range.

How do I verify a Missouri evaluator's license?

Look up the evaluator on the Missouri Department of Health and Senior Services (DHSS), Onsite Wastewater Program license search at https://experience.arcgis.com/experience/5c6151e541b74668bbaad632725224fe.